We were all happy with the pitch we presented on Wednesday
but we were still a little confused with what we were doing. As a member from
the group we not here today we still had to continue with our planning.
In lesson today we decided to have another group chat with
Rebecca.
We talked about how we should film our base tracks and if we
should lose or add another location.
We decided we were going to keep our locations but stick to
the idea of filming our video very similar to Jessie Ware’s Running video because it promotes the artist and the music very well filming the artist from different distances and angles with a moving camera as it fits with we want to show and do based on the target audience and genre.
So next lesson we are going to film Sibora from different
camera distances and angles to produce more test shots and a shot list. So that
we can have more of an idea of what we our going to do when we do our filming
for the music video.
We also have to correct our production schedule as it was
not right during the pitch.
We have also planned that on the 23/10/12 we our going to
check out the locations properly so that we can talk to who is in charge and
have images of the location while it is empty giving us more of idea of what we
can do there and how we our going to film Sibora.
No comments:
Post a Comment